Staticmap?center=49

Vancouver Olympic/ Paralympic Centre

Editing mode. Click on the "edit" links to edit items on this page. Exit edit mode.
Location

4575 Clancy Loranger Way
Vancouver, British Columbia
Canada

Content Type
  • Building
Certifications & Awards
project team

Summary

The Vancouver Olympic/ Paralympic Centre is located in Vancouver’s Riley Park neighbourhood near Queen Elizabeth Park. It was the home of competition curling events during the 2010 Winter Games. The venue will now be converted to a community facility for the residents of Vancouver, housing a new community centre, ice rink, curling club, library, preschool, field house and offices, as well as an aquatic centre with indoor and outdoor pools. The entire complex is fully accessible.

Size

174,500 sq ft

Sustainability Features

Sustainable Site

  • Legacy facility for the community: to be retrofitted after the Olympics
  • erosion and sediment control plan
  • public transportation access, bicycle storage/change rooms provided
  • alternative fuel refueling stations and sustainable parking strategies provided
  • maximum reduction of heat island effect at roof and parking
  • light pollution reduced through sustainable electrical design
  • Net Zero green space loss

Water Efficiency

  • water harvesting for use in dual-flush water efficient toilets
  • Efficient water use: 30% reduction in potable water use

Energy and Atmosphere

  • Energy-efficient design: 40% reduction in energy use
  • excess heat from ice slab cooling used to heat building, aquatic centre, future community centre and run air conditioning system
  • ongoing measurements and verification of building systems, best practice building commissioning
  • elimination of HCFC and Halons in HVAC equipment
  • purchase of green power

Materials and Resources

  • storage and collection / separation of recyclables provided
  • Construction waste management: diversion of 75% of construction waste from the landfill
  • use of recycled content and regional materials for new construction
  • use of FSC certified and sustainable wood

Indoor Environmental Quality

  • achieved required indoor air quality
  • provided carbon dioxide monitoring
  • indoor materials are low V.O.C., low fumes and no urea formaldehyde used
  • provided high level of thermal comfort, ventilation and lighting system
  • provided daylight and views for 90% of spaces

Energy and Environment

A major goal for the project was to achieve a net zero loss of green space. The new complex is situated primarily on a former gravel parking area thereby reducing disturbance to the surrounding parkland. During construction, trees within the venue construction area were salvaged and relocated, and 75 percent of construction waste was diverted from the landfill. Salvageable materials will be recycled when the existing community centre and pool are demolished and the site is remediated back to park space.

The Vancouver Olympic/ Paralympic Centre is accessible by public transit and provides on-site bike storage and change rooms, thereby supporting active transportation. The project meets minimum parking requirements with provisions made for car-pooling and electric plug-ins for hybrid or electrically powered vehicles. Downward facing, lower intensity lighting helps to minimize light pollution from the site, and a white roof helps to reflect the sun’s energy, therefore helping to minimize the urban heat island effect.

Waste heat is captured and re-used from the refrigeration plant and swimming pool to heat other building spaces, including the adjacent aquatic centre, and to produce domestic hot water for the facility. This, along with energy efficient fixtures and natural daylight illuminating 90 percent of the space, results in a 40 percent reduction in energy use for the facility.

The design team was initially confronted with the problem of a high water table that was continuously replenished by an underground stream running through the site. This challenge was overcome by developing an innovative approach wherein water is pumped up from underground and used to supplement toilet flushing and irrigation. Rainwater is also collected and stored for use in dual-flush toilets, therefore reducing the amount of potable water used in the facility by up to 30 percent.

Hydrochlorofluorocarbons (HCFCs) and Halons, commonly used for industrial-scale heating and cooling needs, have been shown to cause ozone depletion and, in the case of  HCFCs, are powerful greenhouse gases. For this reason, both HCFCs and Halons were eliminated in the Heating, Ventilation and Air Conditioning (HVAC) system of the Olympic/ Paralympic Centre. Excellent indoor air quality is achieved by using low Volatile Organic Compound (VOC) paint and avoiding the use of urea formaldehyde materials.

The Olympic/ Paralympic Centre employs a state-of-the art ultraviolet (UV) disinfection system for its pool water, rather than the more conventional approach of chlorine-based disinfectants to reduce microbiological counts in swimming pool water. These chloride disinfectants, associated with the characteristic “pool smell”, are claimed to be carcinogenic and cause “red eyes” and skin irritation. UV disinfection has been shown to reduce overall chlorine consumption by 50 percent without an increase in bacterial counts. A further benefit is improved indoor air quality, as well as lower demands on the ventilation system, thereby saving energy and associated costs. The building is maintained and operated using green and sustainable housekeeping through the use of environmentally responsible cleaning products.

Ecomony

It is estimated that the facility will attract approximately one million visitors per year, making it a significant economic driver in the community.

Construction of facilities like the Vancouver Olympic / Paralympic Centre supports green and clean supply chains in the Vancouver region by mandating the sourcing of sustainable building materials that are better for the environment and for our health. With an increasing number of such projects, the demand for low-impact green technologies, materials and services also increases. The “green industry” is one of the fastest growing sectors in the province and is on its way to making British Columbia a global leader in green technology, building and design.

Community

A key benefit of the project is the concept of a strong and meaningful legacy for the community after the Winter Games. While the Vancouver Olympic/ Paralympic Centre was built as a core venue for the 2010 Olympic and Paralympic Winter Games, its flexible design facilitates the repurposing of the facility into an integrated community complex that residents will use and enjoy for years to come. The future comprehensive community complex will house a community centre, library, ice rink and pool. Through the site selection and design of the Vancouver Olympic/ Paralympic Centre, every effort was made to ensure that the facility would be a well-used community space for many years to come.

Audio Tour of this building

This building is part of the City of Vancouver Green Building Audio Tour, a collection of audio recordings about Vancouver's greenest buildings. Each three-minute recording takes the listener on a virtual 'tour' of the building's green design features, guided by the architect or member of the design team. You can listen to them online, via podcast, or via your cell phone by calling 604-673-8150. The Vancouver Green Building Audio Tours were created through a partnership between City of Vancouver Sustainability Office and the Open Green Building Society.

To hear the audio guide for this building click on the player at the top of the left sidebar on this webpage, or dial 604-673-8150 and enter code 01.

References

Sources include: