loading map...
« Previous 1 3 4 5 6 7 8
Displaying items 1 - 150 of 1182 in total KML, RSS
Limit Results to:

100 Adelaide Street West Residential Conversion

This project involves the conversion of the existing 16 storey 1933 office building into a residential complex of approximately 120 suites. Construction will consist of the repair of the existing envelope, the renovation of the buildings interior and the revitalization of the buildings Mechanical/electrical components.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10768) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/100_adelaide_street_west_residential_conversion
Last edited by CaGBC Import bot 7 months ago

10830 - Jasper Avenue Renovation

The existing 11 storey circa 1960's office building will be selectively demolished to the super structure, including an initial asbestos abatement. All underground parking structure decks will be structurally upgraded as well as expanded to the east. The leasable office areas of the building will then be expanded in floor area to the south and east on the 2nd to eleventh floors and the new building facades will be clad with a new high efficience glazing system. The main floor retail component of the building will be re-partitioned and expanded to the east, to accomodate a wide variety of retail/restaurant tenants and will be fully glazed to Jasper Avenue and 108th Street. The new building incorporates specific pedestrian and landscaping requirements outlined by the Downtown Main Street Commercial zoning and the retail main floor will provide excellent human scale to Jasper Avenue pedestrians, while incorporating the larger upper floor footprints. Surface/outdoor parking for the retail main floor tenants will be provided on the rear roof deck of the main floor retail. This parking and the building loading and refuse/recycling areas will be accessed from the north lane of the property.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10502) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/10830_jasper_avenue_renovation
Last edited by CaGBC Import bot 7 months ago

11100 Jasper Avenue

New office building; 16 storeys, 59 m high, 16,700 s.m. total area with multi-level underground parking of 134 stalls and main floor retail. Located adjacent to the downtown core in Edmonton. Site area is 1,484 s.m. Single storey existing building on site to be demolished with 90% of material to be recycled. The intent is to achieve a LEED Silver Rating.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10734) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/11100_jasper_avenue
Last edited by CaGBC Import bot 7 months ago

111 Richmond St - Revitalization

This project involves the revitalization of a 15 storey office building constructed in 1954. The scope of work is to repair and restore the existing exterior envelope, restor and renovate the interior base building features plus upgrade the mechanical/electrical systems.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10769) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/111_richmond_st_revitalization
Last edited by CaGBC Import bot 7 months ago

121 Research Drive

121 Research Drive is the most recent project to be undertaken at Innovation Place. The development is designed to accomodate the growth in the information technology sector in the park. The building will encompass 5 floors, complete with a full basement and partial penthouse to accomodate the elevator machine room and mechanical services.

Natural lighting is a premium feature of the building design, so glazing is maximized and the floor plate dimensions set to optimize the penetration of daylight. Building systems including building envelope, mechanical, electrical and building controls, are selected to meet the CBIP criteria for energy consumption.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10209) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/121_research_drive
Last edited by CaGBC Import bot 7 months ago

122 Dorey Avenue Mulit-tenant Leased Warehouse

East Port Properties Limited, as Agent and Manager for the owner, HOOPP (Hospital Organizations of Ontario Pension Plan) Realty Inc. - The multi-tenant leased warehouse is a 63,180 sq. ft. tilt-up concrete building with a 24 foot clear height. Sandwich panel walls, under slab insulation, and an R-30 insulated roof contribute to an efficient building envelope. The primary heat is supplied by a natural gas fired in-floor heating system, with supplementary natural gas unit heaters adjacent to loading bay doors.

Site cast and erected concrete construction allowed the building to be constructed with a large volume of locally available materials, and a high percentage of recycled content through the reduction of portland cement in the concrete.

Punched windows around the entire perimeter of the building at 20 foot high will provide up to 75% daylighting in the space. This is enhanced by supplemental skylights to make up for losses caused by racking inside the warehouse. Lighting is designed with high-efficiency fluorescents, dimmers and motion sensors to supplement the daylighting available through the glazing.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11344) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/122_dorey_avenue_mulittenant_leased_warehouse
Last edited by CaGBC Import bot 7 months ago

150 Slater Street

This is a 19 storey

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11915) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/150_slater_street
Last edited by CaGBC Import bot 7 months ago

151 Front Street West and Skywalk

36-story office tower and technology center with parking for 323 vehicles at 151 Front Street West, 7 Station Street and 20 York Street. Project also includes: two skywalks, one connecting buildings to mass transit system and one to convention center, CN Tower and Rogers Center.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10693) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/151_front_street_west_and_skywalk
Last edited by CaGBC Import bot 7 months ago

180 Kent (at Minto Place)

19 storey Class "A" office building located in downtown Ottawa. Built on the transit lines, this building is designed for the customer who cares about their employees and the environment.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10250) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/180_kent_at_minto_place
Last edited by CaGBC Import bot 7 months ago

180 West Esplanade

Multi tenant office building.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11735) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/180_west_esplanade
Last edited by CaGBC Import bot 7 months ago

18 York

Located at the northwest corner of York Street and Bremner Boulevard, 18 York will be a 650,000 sf, 26-story office tower with ground floor retail and three levels of below grade parking. The building is being designed by Kuwabara Payne McKenna Blumberg Architects and features a landmark glass facade. The building will be connected to the PATH system and is conveniently located near Union Station. Colum-free design and a raised floor system provide increased floor efficiency and high flexibility for tenants. Some of the notable design features include energy-efficient HVAC systems incorporating Deep Lake Water Cooling and individual user controls, dimmable, daylight responsive lighting and stormwater capture and re-use.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11485) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/18_york
Last edited by CaGBC Import bot 7 months ago

1 Bloor

1 Bloor. The one-acre property at the corner of Bloor and Yonge will become the number one residential, hotel and retail address in Canada. 1 Bloor will reach 80 stories in height, becoming the tallest residential building in the country. With spectacular views of the city and the lake, 1 Bloor will become a stunningly elegant new corner of Toronto's version of Fifth Avenue.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11008) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/1_bloor
Last edited by CaGBC Import bot 7 months ago

1 Kingsway Community Facility

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/1_kingsway_community_facility
Last edited by Vancouver Economic Development Commission 7 months ago

208xG070B - BD LEED CI

The project is a tenant fit out of a newly constructed office building. The office building is registered for LEED Core & Shell certification with the USGBC.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 12069) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/208xg070b_bd_leed_ci
Last edited by CaGBC Import bot 7 months ago

20 River Terrace, The Solaire

The Solaire at 20 River Terrace is a 27-story, 293-unit, glass-and-brick residential tower in Battery Park City, a planned residential and commercial neighborhood built on landfill bordering the west side of New York City's financial district and directly adjacent to the site of the former World Trade Center. It is the first building designed in accordance with new environmental guidelines instituted in 2000 by the Battery Park City Authority (BPCA), the government entity that has overseen the development of Battery Park City since 1969.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=273) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/20_river_terrace_the_solaire
Last edited by US Department of Energy 7 months ago

2211 West Fourth Avenue (Capers multi-use development)

picture from 2211 West Fourth Avenue (Capers multi-use development)

Key Sustainability Features

  • Ground source heat pump
  • Double exterior wall system
  • Thermally separated windows

Often refered to as the Capers Building, this project has become a much-referenced example of green building practices.

Much more than a corner market, the entire complex uses a ground source heat pump to heat and cool, a rainscreen envelope, a double exterior wall system, and thermally separated windows resulting in excellent acoustic, moisture, and insulation performance.

The building’s lighting strategies maximize daylight and feature low-energy electric fixtures. Residents enjoy low-emission carpets made from recycled pop bottles, filtered water, and usable green roof space.

 

This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain.

/buildings/2211_west_fourth_avenue_capers_multiuse_development
Last edited by sheryl 7 months ago

2490 Bloor

Mixed use mid-rise 12 storey building with a 4 storey pop up. 1,019.52 metres square of retail at grade and 271 residential units.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11998) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/2490_bloor
Last edited by CaGBC Import bot 7 months ago

255 McCaul, University of Toronto St.George Campus, Capital Projects and Facilities and Services offices.

This LEED® CI project is located on the 4th floor of 255 McCaul Street, Toronto, Ontario and will serve as the University of Toronto’s Facilities and Services Group Head Office. The building itself will have recently undergone a revitalization to improve functionality and as well as energy performance. The University and the Facilities and Services group intend to target LEED® CI Silver with best efforts towards achieving LEED® CI Gold. Measures implemented within the scope of work include: Energy efficient lighting and controls, optimized HVAC performance, low VOC interior finishes, the use of rain water harvesting to flush toilets, water efficient plumbing fixtures, and operable windows, maximizing daylight and views for all occupants. This LEED project is one of University of Toronto’s many commitments to being a positive and creative force in the protection and enhancement of the local and global environment, through its teaching, research and administrative operations.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10942) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/255_mccaul_university_of_toronto_stgeorge_campus_capital_projects_and_facilities_and_services_offices
Last edited by CaGBC Import bot 7 months ago

25 York Street

25 York Street is a leading edge high rise office building, located in downtown Toronto. The project is targeting LEED Gold CS certification and boast the following features:

  • 11' ceilings with windows extending

from floor to ceiling, maximizing the intake ofnatural light on each floor,

  • Pressurized raised floors provide individual temperature control for all employees and greater access to fresh air,

  • Constant air-quality monitoring to ensure a healthier environment,

  • Occupancy sensors for automatic lighting whenever needed,

  • Constructed from environmentally

friendly materials.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10334) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/25_york_street
Last edited by CaGBC Import bot 7 months ago

2650 Bristol Circle

two office buildings too be leased to tenants.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11508) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/2650_bristol_circle
Last edited by CaGBC Import bot 7 months ago

2699 Speakman Drive

2699 Speakman Drive is a 4-storey multi-use office building.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10641) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/2699_speakman_drive
Last edited by CaGBC Import bot 7 months ago

2 International Renovation

Interior fit-up for corporate office

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11389) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/2_international_renovation
Last edited by CaGBC Import bot 7 months ago

2 Research Drive Redevelopment

2 Research Drive, located at Regina Research Park is being developed by Innovation Place

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10590) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/2_research_drive_redevelopment
Last edited by CaGBC Import bot 7 months ago

300 Front

300 Front is a 50 storey residential building with retail shops. The building will be located in the heart of Toronto's entertainment district.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11399) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/300_front
Last edited by Jeff Ranson 27 days ago

3-1-1 Contact Centre

The City is establishing the 3-1-1 Contact Centre located at Metro Hall, 55 John Street, 2nd floor Toronto, Ontario. The Contact Centre will be located in the former Council Chambers which are being retrofitted and renovated for this purpose.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10607) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/311_contact_centre
Last edited by CaGBC Import bot 7 months ago

340 12 Avenue Tenant Improvements

New professional offices for Toker + Associates, an architecture and interior design consulting firm.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11257) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/340_12_avenue_tenant_improvements
Last edited by CaGBC Import bot 7 months ago

3rd Avenue Office Building

3rd Avenue office building is a new office located in downtown Saskatoon. It will house a number a new business in the future. The building is stone throw away from a public transit termnal and just a couple of blocks away from a scenic bike route along the south Saskatchewan River.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11334) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/3rd_avenue_office_building
Last edited by CaGBC Import bot 7 months ago

406 Adelaide Street Condominiums

The proposal for this site is a 19 story residential tower. The general massing is composed of a 13 story slab tower situated on the west side of the site. It is orientated on the north south axis to take full advantage of the day time sun and city views. The tower steps down onto a 6 story L-shaped podium. The east wing of the podium is 6 stories with an additional 2 stories above stepped back.

The height of the tower will be 63 meters (plus 5 meter mechanical penthouse). The project is comprised of 488 meters squared of ground floor retail space and 23154 meters squared of residential space. The residential area is composed of ground floor lobby, 304 residential units (29 studio, 91 one bedroom, 118 one bedroom plus den, 14 two bedrooms, 52 two bedrooms plus den) indoor and outdoor amenity spaces and 176 parking spaces.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10671) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/406_adelaide_street_condominiums
Last edited by CaGBC Import bot 7 months ago

46 Wellesley Condominiums

This site is located on the north side of Wellesley Street East, in the first block east of Yonge Street. The building is 29 stories in height with a four story brick podium base.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10669) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/46_wellesley_condominiums
Last edited by CaGBC Import bot 7 months ago

4 Norman Road Academic Building

New 3 storey academic building for ESL/International Groups Classics and Humanities located at Brock University, St. Catherines ON. Project consists of seminar rooms, an international student lounge, study/waiting area and food services on the ground floor and offices, meeting rooms , lounges and an archeology workshop on the upper 2 levels.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11519) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/4_norman_road_academic_building
Last edited by CaGBC Import bot 7 months ago

4 Times Square

In 1995, Four Times Square was the first speculative office building to be developed in New York City in almost a decade. It has 48 stories of occupied space and was the first project of its size and financial structure (multi-tenanted and not owner-operated) in the U.S. to adopt standards for energy efficiency, sustainable materials, and indoor environmental quality, as well as for responsible construction, operations, and maintenance practices.

/buildings/4_times_square
Last edited by alexg 5 months ago

5750 Explorer Drive

The new five storey office building is being built along the 401 highway to provide tenant space in the greater Toronto area. Energy efficient design and a bi-fuel generator provide the tenant with significantly reduced operating costs through energy conservation and peak shaving and lengthy full building backup power. The tenants will further enjoy the improved indoor air quality resultant of the careful selection of low toxicity LEED compliant materials throughout the building and Redcliffe's green housekeeping which will only allow low toxicity cleaning chemicals during operation. This building is a trial construction to attract tenants to a building with measurable and significant health, environmental, and operating cost benefits.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10363) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/5750_explorer_drive
Last edited by CaGBC Import bot 7 months ago

602-44 Princess Street

602-44 Princess is the new offices of Sustainable Solutions Inc., BGW & Associates and THINK Design. The Project is located a heritage building in WinnipegÂ’s Exchange District, a national historical site celebrating the architecture on the turn of the last century.

The intent of the project was to embrace the best of both the old and new in the building, maximizing the reuse of the Douglas fir, oak hardwood and rich Manitoba Brick while sensitively combining it with new green materials that utilize a high level of recycled content and emit very low levels of VOCÂ’s. The project has also incorporated a comprehensive water reduction strategy that reduces water consumption by more than 40%. The project has also incorporated a comprehensive daylighting strategy with high efficiency lighting fixtures and a comprehensive control system to maximize comfort will minimizing the projects energy consumption and environmental impact.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11032) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/60244_princess_street
Last edited by CaGBC Import bot 7 months ago

60 Richmond St. Housing Cooperative

housing cooperative in Toronto

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10731) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/60_richmond_st_housing_cooperative
Last edited by CaGBC Import bot 7 months ago

74 Industry

2-storey, 20,000sf warehouse to be converted into office space. Existing structure and roof to be reused with upgrades to mechanical system, windows, and interiors.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10978) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/74_industry
Last edited by CaGBC Import bot 7 months ago

777 Main West

New 3-1/2 story office building with a floor place of approx 18,000 sq ft and a GFA of approx 65,000 sq ft.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10966) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/777_main_west
Last edited by CaGBC Import bot 7 months ago

77 Charles Street West

16 storey mixed-use building mainly residential with a college and student residence on the first 4 floors.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11468) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/77_charles_street_west
Last edited by CaGBC Import bot 7 months ago

780 Brewster

conversion of industrial semi abandoned historic building into office space

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10424) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/780_brewster
Last edited by CaGBC Import bot 7 months ago

801 Brennan, Centre administratif

Rénovation d'un édifice à bureaux de 29 646 mètres carrés - Nouveau siège social de la Ville de Montreal

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10547) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/801_brennan_centre_administratif
Last edited by CaGBC Import bot 7 months ago

85 Enterprise Drive Office Development

Downtown Markham, a 243-acre mixed-use, urban community, developed and built by The Remington Group Inc. will see over 10-million square feet come to life with 9,500 residents and 16,000 employees right in the heart of Canada's High-Tech Capital. Situated between Warden Avenue and Kennedy Road, just north of Highway 407 in Markham, this urbane environment will seamlessly mesh European-inspired, pedestrian friendly streets, boutiques, squares, exclusive residences and a bustling commercial district with over 72 acres of parks and open spaces bordered by the lush Rouge River valley. The Honeywell Office Development, located within Phase 1 of this urban development, will be a 5 storey, 14,000 square meter office facility. The Remington Group Inc. are setting the new standard for quality, amenities, and environmental sustainability in Markham's central core, Downtown Markham.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10566) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/85_enterprise_drive_office_development
Last edited by CaGBC Import bot 7 months ago

85 The Donway West

New condominium with retail area on the ground floor and below ground parking.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11920) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/85_the_donway_west
Last edited by CaGBC Import bot 7 months ago

889 Yonge - Wellness Centre

Renovations to existing 3 storey historical building. Materials used consisted of eoco friendly flooring, FSC wood, formaldehyde-free plywood, no MDF used, laminate for countertops, 100% water based and toxic free woodwork & floor finishes

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11533) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/889_yonge_wellness_centre
Last edited by CaGBC Import bot 7 months ago

99 Westmorland Street

Commercial office building in Downtown Fredericton

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10958) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/99_westmorland_street
Last edited by CaGBC Import bot 7 months ago

AA Heaps 4th Floor Renovation

The fourth floor of the historic AA Heaps Building will be renovated

accommodate the relocated offices of the Public Schools Finance Board. The primary goal of this project is to provide the highest quality work environment while engaging in sustainable construction and making use of existing infrastructure. Low-flow plumbing fixtures, extensive reuse of materials, and increased occupant access to environmental controls are just a few of the innovations being undertaken in this project.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11739) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/aa_heaps_4th_floor_renovation
Last edited by CaGBC Import bot 7 months ago

aérogare de Kuujjuaq

Le projet est la construction d'une nouvelle aérogare pour la ville de Kuujjuaq au Québec.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10149) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/arogare_de_kuujjuaq
Last edited by CaGBC Import bot 7 months ago

Abondance le Soleil

picture from Abondance le Soleil
Abondance le Soleil project is a highly energy — and resource-efficient triplex being built on an empty lot in Verdun, Quebec, just south of downtown Montreal. One of the CMHC EQuilibrium Winners /buildings/abondance_le_soleil
Last edited by Jeff Ranson 7 months ago

Aboriginal Personal Care Home

A single-storey, 4890 s.m. 80-bed long-term care facility employing approximately 100 staff located within a short walking distance of Southeast College in Winnipeg, Manitoba, Canada. The facility is open to all people in Winnipeg eligible for personal care home placement, but will be targeted to meet the specific cultural and linguistic needs of First Nations people.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10069) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/aboriginal_personal_care_home
Last edited by CaGBC Import bot 7 months ago

Academic Health Sciences, D-Wing

This new facility will provide research space for Neurological, Cardiovascular, Cancer and

Immunological Research, and Nutrition and Metabolism studies.

The majority of the building consists of laboratory and vivarium spaces.

D-Wing is a significant addition to the B Wing of the existing Health Sciences Building. The project comprises a four story addition on the east side and six story addition on the north side of the B Wing.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11558) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/academic_health_sciences_dwing
Last edited by CaGBC Import bot 7 months ago

Accolade

Highrise Condominium with amenities

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10355) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/accolade
Last edited by CaGBC Import bot 7 months ago

Écocentre Lasalle

Écocentre (site de réemploi, de récupération et de valorisation de matières résiduelles) à volet industriel incluant un bâtiment administratif et des entrepôts.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11659) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/cocentre_lasalle
Last edited by CaGBC Import bot 7 months ago

École Restigouche-Est

New regional school to service this rural New Brunswick community.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 12102) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/cole_restigoucheest
Last edited by CaGBC Import bot 7 months ago

École Sécondaire Mirabel

CSRDN - Construction d'une nouvelle école secondaire 1 à 5 à Mirabel.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10786) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/cole_scondaire_mirabel
Last edited by CaGBC Import bot 7 months ago

École secondaire Jeunes sans frontières

This is a secondary school for the Conseil Scolaire de District du Centre-sud-Ouest. There is also a training school located within the same building to facilitate continuing education. This project is located in Brampton Ontario.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10231) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/cole_secondaire_jeunes_sans_frontires
Last edited by CaGBC Import bot 7 months ago

École Victor-Brodeur

picture from École Victor-Brodeur

École Victor-Brodeur is a K-12 French Immersion school in Victoria, BC built for School District No. 93, le Conseil scolaire francophone de la Colombie-Britannique (CSF).

/buildings/cole_victorbrodeur
Last edited by Advicas Group Consultants Inc. 7 months ago

Adamson Associates Architects Toronto Office

24 Spadina will soon be home to Adamson Associates Architects new studio space. Located in the old McGregor Sock factory, the project will blend the original post and beam construction with modern colours and textures in order to create an open and creative atmosphere for employees.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10527) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/adamson_associates_architects_toronto_office
Last edited by CaGBC Import bot 7 months ago

Addition and Renovation to College of Law Building, University of Saskatchewan

The College of Law Addition and Renovation at the University of Saskatchewan is design to accommodate the future requirement of the faculty of Law and Law students. The 3200 sq. meters three level expansion will contain lecture theaters, classrooms, administrative offices and study areas. The buildiing will also house the Center for Aboriginal Law Studies. This facility is intended to be a LEED Gold building.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10357) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/addition_and_renovation_to_college_of_law_building_university_of_saskatchewan
Last edited by CaGBC Import bot 7 months ago

Adera Green Ltd. Bldg #1

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/adera_green_ltd_bldg_1
Last edited by Vancouver Economic Development Commission 7 months ago

Adera Green Ltd. Bldg #2

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/adera_green_ltd_bldg_2
Last edited by Vancouver Economic Development Commission 7 months ago

Édifice ÉcoData

Nouvel édifice à bureaux

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11245) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/difice_codata
Last edited by CaGBC Import bot 7 months ago

Édifice fédéral multi-clients du 740, rue Bel-Air

Déconstruction de l'ancien édifice, réhabililtation des sols et construction d'un édifice fédéral pour usage de bureaux et aires d'entreposage dédié à divers clients fédéraux.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10301) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/difice_fdral_multiclients_du_740_rue_belair
Last edited by CaGBC Import bot 7 months ago

Édifice FondAction

Édifice à bureau d'une superfice de 5 800m2 sur six niveaux hors sol

Trois niveaux de stationnement en sous-sol d'une capacité de 54 places

Structure hors sol: bois lamellé

Structure en sous-sol: béton

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 12019) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/difice_fondaction
Last edited by CaGBC Import bot 7 months ago

Édifice SAM

Deconstruction et remplacement de certains systèmes d'enveloppe, notamment les fenêtres et autres parement de pierre. Réaménagement intérieur majeur des lieux en édifice à bureaux.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11717) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/difice_sam
Last edited by CaGBC Import bot 7 months ago

Administration Building - Womens Correction Facility

The new Administration Building of the Women's Correctional Center

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11888) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/administration_building_womens_correction_facility
Last edited by CaGBC Import bot 7 months ago

AERL - Aquatic Ecosystem Resource Laboratory

picture from AERL - Aquatic Ecosystem Resource Laboratory

The Aquatic Ecosystems Research Laboratory (AERL) is a four story, 6,000 m facility that serves as an interdisciplinary research facility at the University of British Columbia for

  • The UBC Fisheries Centre
  • The Institute for Resources Environment and Sustainability
  • The BC Fisheries Research Unit

Completed in 2006 AERL features a state-of-the-art Immersion Laboratory that simulates real-time underwater and coastal habitats. The Canada Green Building Council has awarded LEED-BC Gold Certification to UBC-AERL. A large central atrium acts as a natural ventilation stack and eliminates the need for mechanical ventilation systems. In the summer, concrete surfaces are naturally cooled in the evening, providing radiant cooling for the upper three floors during the day. Thanks to the efforts of AERL staff and student volunteers, this is the only facility on the UBC Point Grey campus to have a building-wide composting program.

/buildings/aerl_aquatic_ecosystem_resource_laboratory
Last edited by Eesmyal Santos-Brault 5 months ago

AeroCentre-V

The AeroCentre-V speculative office building is located in a business district just south of the Toronto International Airport, in Mississauga. Intended to house approximately 1500 occupants, this project will mitigate its environmental impacts by leveraging rainwater collection and low-flow fixtures to reduce demand on municipal water, employing strategies to reduce urban heat island effect, and installing low-emitting interior finishes. Use of under-floor air distribution and provision of natural light sources with controlled shading provide opportunities for reduced energy consumption over typical office buildings while enhancing occupant comfort.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11043) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/aerocentrev
Last edited by CaGBC Import bot 7 months ago

AFRESH Home

picture from AFRESH Home

This demonstration housing project at British Columbia Institute of Technology’s (BCIT) Burnaby Campus was the result of a team effort by the Canada Mortgage and Housing Corporation, BCIT, the Greater Vancouver Home Builders’ Association, the Canadian Plywood Association, UBC School of Architecture, and a host of product and service providers.

Afresh Home is an affordable, durable, healthy and environmentally conscious home that is designed to change easily as the lifestyle of its occupants change. Green features include energy-efficient windows, durable building envelope, low-flush toilets and aerator taps, low-emitting building materials, and building integrated photovoltaics.

www.commons.bcit.ca/chcc/afresh.html

 

This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain.

/buildings/afresh_home
Last edited by sheryl 7 months ago

Agrandissement du Pavillon Sainte-Marie

The project is the expansion and renovation of an existing long term nursing home for a sisters congregation in Nicolet, Quebec.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10201) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/agrandissement_du_pavillon_saintemarie
Last edited by CaGBC Import bot 7 months ago

Agrandissement Entrepôt et Siège Social J.Walter Compagnie Ltée

L'entreprise J.Walter Compagnie Ltée fut fondée en 1952 à Montreal. L'entreprise s'installe en 1966 à son siège social actuel à Pointe-Claire. Le bâtiment a subi de multiples transformations en parallèle avec l'expansion de l'entreprise. Le présent projet doublera la superficie actuelle du siège social dans le but d'améliorer les installations et d'intégrer la division BIO-CIRCLE. La philosophie de l'entreprise a mené à la conception d'un bâtiment écologique afin d'en faire une vitrine mondiale. La partie centrale du bâtiment marque le point focal du projet. De chaque côté on trouvera les installations de Walter et de BIO-CIRCLE. Un grand hall d'entrée aménagé de nombreux puits de lumière afin de maximiser l'apport de lumière naturelle, autant dans l'agrandissement que dans la portion existante du bâtiment. Les dirigeants de Walter ainsi que l'équipe de professionnels désirent construire un point de repère pour la Ville de Pointe-Claire tout en promouvant la construction écologique pour les bâtiments commerciaux.____________________________________________________________

  1. Walter Company Ltd. was founded in 1952 in Montreal. The company settled in its current head office in Pointe-Claire, in 1966. The building has undergone several transformations that have followed the expansion of the company. The current project will double the current surface area of the head office in order to modernize the installations and integrate the BIO-CIRCLE division. The company's sustainable development philosophy has led to the conception of an ecological building which will be used as a global showcase. The central part of the building marks the focal point of the project. To its sides, will be the Walter and BIO-CIRCLE installations. The grand entrance hall will include skylights to maximize the incoming natural light in both the newly expanded portion as well as in the existing portion of the building. Walter management and the team of professionals involved are committed to creating a landmark for the City of Pointe-Claire, while promoting the concept of ecological construction for commercial buildings.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11448) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/agrandissement_entrept_et_sige_social_jwalter_compagnie_lte
Last edited by CaGBC Import bot 7 months ago

Agrandissement et rénovation palais de justice

Rénovation majeure et agrandissement du palais de justice existant.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11765) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/agrandissement_et_rnovation_palais_de_justice
Last edited by CaGBC Import bot 7 months ago

Agrandissement/Renovations Majeures - Ecole Sainte-Therese

Ecole Sainte-Therese was originally built in 1955, with an addition built in 2000. The school is currently undergoing a major renovation and expansion, consisting of the addition of 26 new classrooms, one new gymnasium, a resource centre, student services, one music room, an administration area, and associated circulation space. The Department of Supply & Services of the Province of New Brunswick understands the value of the LEED® rating system and is aiming to achieve, at a minimum, a LEED® Silver rating. Sustainable measures to be incorporated in the design of the new school include minimizing potable water use, optimizing the building's energy performance, ensuring construction materials are manufactured locally and contain recycled content, providing natural light throughout the building, as well as ensuring a high quality of indoor air.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11509) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/agrandissementrenovations_majeures_ecole_saintetherese
Last edited by CaGBC Import bot 7 months ago

AIBC Headquarters

picture from AIBC Headquarters

This retrofit project combines heritage preservation with green building design. The result is a 1911 building that has been propelled into the future, bringing new life to Victory Square.

Older features of the building have been bolstered to create an interesting and pleasant space at a lowenergy cost. A central atrium was cut into the center of the building, flooding the interior with natural light. Customized cross ventilation is achieved through user-controlled windows and passive solar techniques using sunshades and louvered canopies.

The building design reduces energy consumption to 20% below the ASHRAE 90.1 standard. It also takes advantage of the urban renewal opportunities offered by heritage buildings.

 

This post was imported from the 'Greater Vancouver Green Guide', it's part of the 'Green Guide Portal' to the Green Building Brain.

/buildings/aibc_headquarters
Last edited by sheryl 7 months ago

AIR MILES Reward Program Call Centre

The AIR MILES Reward Program is relocating one of their call centres into a new 4,687 m2 commercial office space. This call centre will house roughly 360 call centre personnel at any given time and will feature an Associate lunch/lounge area, a games room, in addition to having both private and prayer rooms. Additionally, there will be significant telecommunications infrastructure to support the services that are provided from this call centre location.

The AIR MILES Reward Program has made sustainability a key objective for this project and will be locating this space within a LEED for Core and Shell Developments certified building to complement its own LEED for Commercial Interiors space.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11393) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/air_miles_reward_program_call_centre
Last edited by CaGBC Import bot 7 months ago

Aisling Discoveries

Aisling Discoveries Child and Family Centre provides responsive services in partnership with families and communities to strengthen the social and emotional well-being of children and promote their healthy development. This facility will be the new home of Aisling's Toronto Partnership for Autism Services (TPAS) program.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11882) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/aisling_discoveries
Last edited by CaGBC Import bot 7 months ago

Ajax Fire Station & Headquarters

Ajax Fire and Emergency Services, OntarioÂ’s first ISO 9001 registered Fire and Emergency Service is a full-time department committed to providing the highest possible level of customer service to the residents and visitors of the Town. To meet the demands of the growing community, the Town has committed to constructing a new Fire Station & Headquarters as part the first phase of a larger development project at the corner of Rossland Road and Salem Road which will also see the future design and construction of a Municipal Operations Facility.

When constructed, the new Fire Station and Headquarters will be approximately 2,600 sq. m. (27,987 sq.ft.) incorporating a multi-truck apparatus room with support space for Fire Fighters as well as an administrative office component and Emergency Response Centre for 911 calls. In the event of a major disaster, the Ajax Fire Station and Headquarters will be used as the main Emergency Operation Centre for the area.

This project is the first major architectural project promoting environmental initiatives in Ajax and will act as a catalyst for future environmentally responsible development projects.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10322) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/ajax_fire_station_headquarters
Last edited by CaGBC Import bot 7 months ago

Ajax Operations Centre

The new Ajax Operations Centre will be home to the Operations and Environmental Services Department for the Town of Ajax, incorporating all of its divisions under one roof, including Building Maintenance, Fleet Services, Park Services and Public Works. This new 5,344.25 sq. m. (57,527 sq.ft.) facility is being designed to meet atleast a LEED Silver Certification and will incorporate such intitiatives as geothermal heating and cooling, a partial green roof and renewable energy sources. The Town of Ajax is committed to environmental design for its new municipal capital projects.

This building was originally imported from the Canadian Green Building Council's LEED project database id: 11416 on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/ajax_operations_centre
Last edited by Graeme Worthy 7 months ago

Akoya

8 storey condo

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10951) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/akoya
Last edited by CaGBC Import bot 7 months ago

Alberta Conservation Association (ACA) Lethbridge Office

The new 1-storey building contains office, meeting and warehouse space for an association of Alberta wildlife and habitat conservation organizations, and tenant space for like-minded not-for-profit organizations. The .809 ha site, located in a light industrial park in north west Lethbridge, also contains facilities for staff and visitor parking, on-site storm water management and a service yard for field vehicles and trailers.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 12049) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/alberta_conservation_association_aca_lethbridge_office
Last edited by CaGBC Import bot 7 months ago

Albion-Heatherington Community Centre

A small community centre building consisting of a gym, multi-purpose room, and administrative support space.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11083) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/albionheatherington_community_centre
Last edited by CaGBC Import bot 7 months ago

Alderwood Rest Home

This project is a replacement facility for a 70 bed long term care facility located in Baddeck Nova Scotia.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11035) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/alderwood_rest_home
Last edited by CaGBC Import bot 7 months ago

Aldo Leopold Legacy Center

Published in 1949 as the finale to A Sand County Almanac, Aldo Leopold's "Land Ethic" set the stage for the modern conservation movement. Leopold's philosophy included the belief that the idea of community should be enlarged to include, in his words, "collectively: the land." This includes nonhuman elements such as soils, waters, plants, and animals.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=946) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/aldo_leopold_legacy_center
Last edited by US Department of Energy 7 months ago

Alfred A. Arraj U.S. Courthouse

A showcase for sustainable design and a milestone project for the General Services Administration (GSA), this 318,850-square-foot facility is a tangible demonstration of GSA's commitment to environmental stewardship, and it is among the first U.S. Courthouses to meet new Justice Department security standards.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=179) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/alfred_a_arraj_us_courthouse
Last edited by US Department of Energy 7 months ago

All Saints Anglican Church

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/all_saints_anglican_church
Last edited by Vancouver Economic Development Commission 7 months ago

Allsteel Resource Centre

This is showroom space for Allsteel commercial office furniture for the Greater Toronot Area.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10535) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/allsteel_resource_centre
Last edited by CaGBC Import bot 7 months ago

Allwest Commercial Furnishings Office and Showroom

Allwest Commercial Furnishings Office and Showroom

Allwest Commercial Furnishings is one of Alberta's largest contract furnishing companies specializing in providing innovative solutions for the office environment. They have been leaders in the business furniture industry since 1974.

Allwest also has a strong commitment to Canadian manufacturers; blending this commitment with their clients' needs. One of Allwest's major Canadian manufacturing partners, Teknion, is a strong proponent of sustainable design and LEED. Teknion is a leader in sustainable furnishings and have registered their headquarters in Toronto with LEED-EB (US). They are actively working towards registering two showrooms for LEED-CI (Canada) and asked Allwest to also pursue LEED certification for their showroom in Alberta.

Allwest's existing office space is 6,000 square feet, and the new showroom will be 7,000 square feet making the entire project 13,000 square feet. The architectural portion of the expansion was already underway when the decision to apply for LEED was made. Therefore LEED-CI was chosen over LEED-NC. The tenant improvements were already being dealt with as a separate project to the architectural expansion when LEED was adopted. The timing was great as the tenant improvements were just starting to be designed.

The design approach was to develop a building that reflects the quality and beauty of the furniture Allwest sells within the framework of sustainable building with a mandate of achieving LEED-CI certification in Canada. Project goals include the desire to reduce consumption and wastage of materials, energy and water; maximize savings in ongoing operating costs; maximize comfort and safety of building occupants; and act as a leader in sustainable initiatives for the commercial furnishing industry in Alberta.

Technologies applied include the development of high quality, low toxicity interior finishes, efficient lighting fixtures and controls, water efficient plumbing fixtures, and flexible interior spaces with the use of movable wall systems.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10538) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/allwest_commercial_furnishings_office_and_showroom
Last edited by CaGBC Import bot 7 months ago

Alstonvale Net Zero House

picture from Alstonvale Net Zero House
The Alstonvale Net Zero House is a single-family detached house in the village of Hudson, Quebec /buildings/alstonvale_net_zero_house
Last edited by Jeff Ranson 7 months ago

Alvin Hamilton Building

The goal of the project is to take a former shopping mall / commercial

office tower and transform it into an architectural showcase building

suitable for the Government of Canada operations in Saskatchewan. The

project is to perform at a high level in terms of energy efficiency,

environmental responsibility, and functionality. The building will

positively contribute to its urban context while meeting the clients'

needs for accessibility, visibility, security, and citizen centered

services.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10194) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/alvin_hamilton_building
Last edited by CaGBC Import bot 7 months ago

Alvin Reinhard Fritz Architect Inc. - Calgary Office

Commercial office renovation and mezzanine addition

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10557) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/alvin_reinhard_fritz_architect_inc_calgary_office
Last edited by CaGBC Import bot 7 months ago

AMB Building C

3M Office and Distribution Center

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11553) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/amb_building_c
Last edited by CaGBC Import bot 7 months ago

Anders Wohnen e.G.

A car-free development (more to be added...).

/buildings/anders_wohnen_eg
Last edited by selena 7 months ago

Angus Phase VIII

Édifice à bureaux de 4 étages, multilocatif, d'une superficie de 5700m2 + un étage de stationnement en sous-sol.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10678) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/angus_phase_viii
Last edited by CaGBC Import bot 7 months ago

Animal Services Building

Holding and care facility for lost and stray pets including municipal pet licensing .

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 12027) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/animal_services_building
Last edited by CaGBC Import bot 7 months ago

Antex Western Head Office

Renovation of existing office space and development of new office space.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11029) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/antex_western_head_office
Last edited by CaGBC Import bot 7 months ago

AODBT Office Renovation

The AODBT office renovation is the redevelopment of the former Western Groceries warehouse in Saskatoon Saskatchewan. The vision of the project is to focus on the revitalization of not only a building, but also to be a part of the transformation of an entire neighborhood. The site is located in the Caswell Hill area of Saskatoon, which is a core neighborhood just west of the City's downtown. To assist with redevelopment of core neighborhoods, the City of Saskatoon has identified an enterprise zone within the city to encourage growth. Caswell Hill is part of the enterprise zone. As such, the City worked in collaboration with the project team on many facets of the project to ensure a successful outcome.

Giving Staff a Proper Work area

During the facility's design, much effort was made to ensure all staff had the proper work space to perform their daily tasks. One of the most important aspects of this was to get the right amount and type of natural light in to every employee in the building. This was achieved by a mixture of punched windows, a large feature window to the best site view, and skylights where the light is properly diverted. This combination gave the staff light from a variety of directions, along with a view of a beautiful turn of the century neighborhood.

A New Look for an Old Building

The majority of the building shell was kept as is, with the exception of a few punched penetrations for light. However, insulation and cladding was added to all sides of the building for esthetics and added energy efficiency. The roof was also updated, complete with a high-albedo finish to reduce the amount of heat absorption.

Innovative Engineering Solutions

The building's prior use did not require a high level of Mechanical or Electrical systems. As such, many upgrades are required for an office environment. Daylight harvesting technologies are planned for the facility to properly utilize the created penetrations. A highly efficient mechanical system is planned and modeling will be done to ensure the high performance and controllability of the system. Innovative methods of reducing water will also be explored, both through the use of low-flow fixtures, but also by making smart landscaping choices.

The hope for any company is to give its staff the best working environment possible to increase job satisfaction. The project team and owners believe that achieving LEED accreditation is a proven way to provide a better building. As believers in the LEED process, AODBT also wishes to make this building an educational facility that can show interested parties the benefits of a LEED certified facility.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11475) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/aodbt_office_renovation
Last edited by CaGBC Import bot 7 months ago

APEG BC Headquarters

picture from APEG BC Headquarters

Now fourteen years old, the headquarters for the Association of Professional Engineers and Geoscientists of BC (APEG BC) sets a precedent for successful green design, particularly for superior natural lighting technologies. Architects worked along side APEG engineers in an integrated approach to design this successful space.

The electrical systems maximize passive solar energies for lighting and heating. Most noticeable in appearance are precisely shaped “sails” that are suspended within the interior of the structure. These sails distribute natural and artificial light evenly into the interior space. Extensive glazing and fritted glass louvers on the east and south faces also contribute to enjoyable work space for APEG employees.

/buildings/apeg_bc_headquarters
Last edited by sheryl 7 months ago

Apparatus Repair and Maintenance Facility

The Apparatus Repair and Maintenance Facility shall provide emergency repair services for Fire vehicles. This facility shall constitute a component of Calgary's emergency preparedness initiative toward serving the citizens of Calgary.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10819) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/apparatus_repair_and_maintenance_facility
Last edited by CaGBC Import bot 7 months ago

Aquaquest - the Marilyn Blusson Learning Centre

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/aquaquest_the_marilyn_blusson_learning_centre
Last edited by Vancouver Economic Development Commission 7 months ago

Aquaquest: The Mary Blusson Learning Centre

picture from Aquaquest: The Mary Blusson Learning Centre

Key Sustainability Features

  • Waste diverted from landfill during construction: 90%
  • Heat pump system that takes advantage of the constant temperature of adjacent seawater
  • Rainwater capture and reuse
  • Water savings: an estimated 1,480,000 litres of water per year (based on simulation)
/buildings/aquaquest_the_mary_blusson_learning_centre
Last edited by Kalin Harvey 7 months ago

Aquatic Ecosystems Research Laboratory

picture from Aquatic Ecosystems Research Laboratory

The Aquatic Ecosystems Research Laboratory (AERL) is a four story, 6000 m facility that houses three distinct research units:

  • The UBC Fisheries Centre (FC)
  • The Institute for Resources Environment and Sustainability (IRES)
  • The BC Fisheries Research Unit (BCFU)

Completed in 2006 AERL features a state-of-the-art Immersion Laboratory that simulates real-time underwater and coastal habitats. The Canada Green Building Council has awarded LEED-BC Gold Certification to UBC-AERL.

/buildings/aquatic_ecosystems_research_laboratory
Last edited by Design Centre for Sustainability 7 months ago

Archives of Ontario-York University

The project is composed of two distinct pieces. The Archives of Ontario which is located in the podium section of the building, is a 100,000 sq.ft facility which will serve as the primary point of public access for archival documents and will house frequently accessed documents, high value items and special collections. In addition it will be used for general office use, public viewing areas and preservation labs. The second piece of this development is located primarily in the tower portion of the project, it will be composed of roughly 100,000 sq.ft. of academic and administrative space to be leased by York University.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10631) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/archives_of_ontarioyork_university
Last edited by CaGBC Import bot 7 months ago

ARC Resources Office

Fit-up of 8 floors of office space for ARC Resources Energy Trust within the new Jamieson Place building.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11705) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/arc_resources_office
Last edited by CaGBC Import bot 7 months ago

Ardencraig

picture from Ardencraig

Key Sustainability Features:

  • 95% of framing timber was reclaimed
  • Energy savings of 20%+ over conventional practice
  • Minimal stormwater run-off

This single family house built in 1910 was converted into three stacked strata-titled townhouse units with a new in-fill coach house addition. The added density gave the building a Floor Space Ratio (FSR) of 0.75.

An effort was made to preserve the character of the original home. This included restoring certain interior features, preserving the wall framing and roof structure, and using reclaimed wood from demolished buildings for sheathing and framing.

/buildings/ardencraig
Last edited by sheryl 7 months ago

Argonne Child Development Center

Argonne Child Development Center is San Francisco's first solar-powered school. Since Argonne shares its site with San Francisco's largest community garden, neighbor and community participation were essential to the design of the project. The new school building incorporates the surrounding gardens and play areas to stretch the concept of a classroom.

/buildings/argonne_child_development_center
Last edited by alexg 5 months ago

Art and Mary Jane Crooks Dining Hall and Student Centre

picture from Art and Mary Jane Crooks Dining Hall and Student Centre

Brentwood College School is an independent school in Mill Bay located 40 km north of Victoria, BC on Vancouver Island. The school has over 400 students and 40 full time faculty members, half of whom live on campus with their families. The new 24,000 SF Dining / Student Services Centre will house the Laundry, Sewing Room, Campus Store, Student Services and a Student Centre.

/buildings/art_and_mary_jane_crooks_dining_hall_and_student_centre
Last edited by Eesmyal Santos-Brault 6 months ago

Ashbury College Residence

Ashbury College is a private school founded in 1891. It has a history of academic excellence, balanced by community, ethical, spiritual, and athletic goals. The Ashbury College Boys Residence will act as a clear demonstration of leadership and community involvement. It will provide a healthy and productive interior environment, and will step lightly on the earth in which we live.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10784) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/ashbury_college_residence
Last edited by CaGBC Import bot 7 months ago

Assateague Island National Seashore

Thirty-seven miles long, Assateague Island National Seashore covers more than 18,000 acres in the states of Maryland and Virginia. This barrier island is constantly evolving and has moved a quarter mile inland since 1866. Though the park maintains three visitor centers, it has no overnight lodging facilities other than campgrounds.

/buildings/assateague_island_national_seashore
Last edited by Kalin Harvey 7 months ago

Assateague Mobile Bathhouse Project

Assateague is an island on the move. The ocean, shifting sand, and seasonal storms constantly transform the landscape. Natural forces have damaged beach facilities over the years. At Toms Cove, the National Park Service is responding with mobile bathhouse units. Easy to remove and reposition after a storm, each unit includes lightweight changing rooms, passive-solar vault toilets, and a solar-powered shower.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=216) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/assateague_mobile_bathhouse_project
Last edited by US Department of Energy 7 months ago

Assiniboine Community College School of Trades

As part of the Assiniboine Community College's move to the former site of the Brandon Mental Health Centre on the North Hill in Brandon, a renovation and expansion of the historic Pineridge Building will be completed to house the College's School of Trades.

The project will include two new buildings linked by overhead walkways to the existing structure to surround an outdoor courtyard. The Pineridge building will undergo extensive renovations to both the interior and exterior of the building while preserving the historic character of the facility. Special attention will be paid to salvaging and reusing materials disassembled during deconstruction.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11851) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/assiniboine_community_college_school_of_trades
Last edited by CaGBC Import bot 7 months ago

Assiniboine Credit Union Branch Office

The new Assiniboine Credit Union Branch Office located in Winnipeg, Manitoba will include a client banking space, offices and support areas. As part of the Assiniboine Credit Union's commitment to sustainable development, they have targeted a LEED Certified designation under LEED Canada for New Construction & Major Renovations Version 1.0. The project will incorporate a host of sustainable building features including comprehensive energy and water conservation strategies and a high level of recycled, local and low emitting materials.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11263) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/assiniboine_credit_union_branch_office
Last edited by CaGBC Import bot 7 months ago

Athabasca University Academic and Research Centre

As a result of rapid enrolment growth, the University is in need of a building to house academic centre, research groups and administrative services. The new three storey project will provide a comfortable, healthy and productive workplace for faculty and staff of the University. As a sustainable building, the project will utilize the best available environmental design practices to minimize its impact on the natural environment.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11631) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/athabasca_university_academic_and_research_centre
Last edited by CaGBC Import bot 7 months ago

Audubon Center at Debs Park

Located just ten minutes northeast of downtown Los Angeles, Ernest E. Debs Regional Park is a 282-acre urban wilderness owned by the Los Angeles Department of Recreation and Parks. The Audubon Center at Debs Park occupies 17 acres of the park, leased from the City.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=234) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/audubon_center_at_debs_park
Last edited by US Department of Energy 7 months ago

Austria Passive House

description pending /buildings/austria_passive_house
Last edited by karidow 6 months ago

Avalon Discovery 3

picture from Avalon Discovery 3
Avalon Discovery 3 is a grid-tied, solar-powered single family home designed to produce as much energy each year as it consumes on an annual basis. /buildings/avalon_discovery_3
Last edited by Jeff Ranson 7 months ago

Avenue Internationale

1er etage

Salle de conférence

Café/Bistro

Salle multiservice

Salles de classe

Bureaux conseillers

2e etage

Espace locatif

3e etage

Auberge de jeunesse

4e etage

Auberge de jeunesse

Toit vert

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10976) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/avenue_internationale
Last edited by CaGBC Import bot 7 months ago

Avonshire A&B

Avonshire A&B is a condominium consisting of two 21 storey towers joined by three storeys of common ammenity space.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11105) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/avonshire_ab
Last edited by CaGBC Import bot 7 months ago

Baca/Dlo'ay azhi Community School

The Baca Dlo'ay azhi Community School, located on the Navajo Nation reservation in Prewitt, New Mexico, serves students in kindergarten through grade six. The building incorporates Native American cultural concepts including an orientation that reflects the meanings associated with the four cardinal directions. The name means "little prairie dog" in Navajo.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=387) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/bacadloay_azhi_community_school
Last edited by US Department of Energy 7 months ago

Ball's Falls Centre for Conservation

The Ball's Falls Conservation Area is part of the Provincial Conservation Authority's Nodal Park System - providing public education and awareness of the Niagara Escarpment. This new interpretation facility, with it's location on the Niagara Escarpment, will serve as a public entry point to the 20 Valley World Biosphere Reserve and the preserved heritage settlement.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10327) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/balls_falls_centre_for_conservation
Last edited by CaGBC Import bot 7 months ago

Bank of Montreal MacLeod Trail Branch

This is a small branch for the Bank of Montreal and will be located on an existing parking lot on a busy commercial street. The construction will be metal framing with a combination of EIFS, brick & composite metal exterior, a R-40 flat roof and double low-E glazing w/ sun shades.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11447) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bank_of_montreal_macleod_trail_branch
Last edited by CaGBC Import bot 7 months ago

Bank of Montreal Springfield & Henderson Branch

The new BMO Bank of Montreal Henderson & Springfield Branch located in Winnipeg, Manitoba will include a client banking space, offices and support areas. As part of BMOs commitment to sustainable development, they have targeted certification under LEED Canada for New Construction & Major Renovations Version 1.0 for their new project.

The building is designed to provide a healthy, effective and contemporary environment for its clients and staff. A host of sustainable building features including a high level of recycled, local and low emitting materials are integrated into the project. Comprehensive energy, day-lighting and water conservation strategies are incorporated into the project as well.

The project will contribute to the sustainable future of the community through new investment, increased accessibility and positive integration into the existing Neighborhood and Community.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11412) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bank_of_montreal_springfield_henderson_branch
Last edited by CaGBC Import bot 7 months ago

Bâtiment Lanauco

La nouvelle constrution «Bâtiment Lanauco» devrait répondre, le plus adéquatement possible au besoin de l'entreprise. Le batiment sera conçu avec une portion bureau et une portion atelier mécanique. Le tout dans une optique de développement durable.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11109) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/btiment_lanauco
Last edited by CaGBC Import bot 7 months ago

Bay and Adelaide Centre - Phase 1 - West Tower

The corner of Bay and Adelaide streets will soon be home to a new 50 storey high rise office tower. Project highlights include the retention of the existing heritage facade facing Bay and Temperence street

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10335) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bay_and_adelaide_centre_phase_1_west_tower
Last edited by CaGBC Import bot 7 months ago

Bay Side Nursing Home

This project is a new 40 Bed Long Term Care Facility addition to an existing facility that will provide a small scale homelike atmosphere to the residents. The special sustainability strategies will be focused on residents with dementia and how we can enrich their lives within the home.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11505) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bay_side_nursing_home
Last edited by CaGBC Import bot 7 months ago

BC Cancer Research Centre

picture from BC Cancer Research Centre

Key Sustainability Features:

  • Potable water consumption reduced by 43% with low flow plumbing fixtures and waterless urinals
  • 26% of all construction and finishing materials had recycled content
  • Annual energy savings predicted to be $381,269
  • $7 million under budget
  • Finished one day ahead of schedule
  • Water efficient landscaping reduces sprinkler requirements by 76%
  • 77% of building materials were manufactured locally and 26% of the raw materials were extracted locally
  • Heat recovery from the chiller offsets approximately 60% of the space heating load
  • Energy efficient lighting is 23% more efficient than MNECB including occupancy sensors and daylight sensors
  • Views for over 90% of spaces
  • The B4 basement level houses one of the largest vivariums in Western Canada

The BC Cancer Research Centre is a 15-storey research building that is home to 600 scientists and medical professionals conducting research into more than 200 types of cancer. It is a LEED Gold certified project, the first healthcare/laboratory facility in Canada to achieve such a high level of certification.

/buildings/bc_cancer_research_centre
Last edited by ibudke 7 months ago

BC Housing - 12 Sites

BC Housing has gone beyond the recent provincial mandate, committing to achieving LEED Gold with a minimum of 6 points for EA credit 1 (optimize energy performance) and targeting carbon neutrality, not only for the housing facilities it owns and operates but also those which BC Housing has funded and that will be operated by other organizations.

/buildings/bc_housing_12_sites
Last edited by lauren 7 months ago

BC Hydro - Electrical Harmonizer

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/bc_hydro_electrical_harmonizer
Last edited by Vancouver Economic Development Commission 7 months ago

BCIT Cellulosic Ethanol Pilot Plant

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/bcit_cellulosic_ethanol_pilot_plant
Last edited by Vancouver Economic Development Commission 7 months ago

BCIT - Solar Canopy Illumination System Demonstration Project

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/bcit_solar_canopy_illumination_system_demonstration_project
Last edited by Vancouver Economic Development Commission 7 months ago

Bell Canada Westwinds Interiors

This interiors project will provide new office space for Bell Canada in Calgary

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10606) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bell_canada_westwinds_interiors
Last edited by CaGBC Import bot 7 months ago

Belle Rive Public Elementary & Junior High School

New K-9 school for the Edmonton Public School Board.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11645) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/belle_rive_public_elementary_junior_high_school
Last edited by CaGBC Import bot 7 months ago

BigHorn Home Improvement Center

Built on a previously developed site in Silverthorne, CO, the BigHorn Home Improvement Center is an example of responsible development.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=54) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/bighorn_home_improvement_center
Last edited by US Department of Energy 7 months ago

Bill Crothers Secondary School

A 20 000 m2 four story High School to be located in the centre of Markham Centre (a new dense urban core for a Toronto suburb). The school programme will focus on Athletics and promotion of Healthy Active Living.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10165) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bill_crothers_secondary_school
Last edited by CaGBC Import bot 7 months ago

Bill Woodward School

Construction of a new Grade 5 to Grade 12 school.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11394) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bill_woodward_school
Last edited by CaGBC Import bot 7 months ago

BINBROOK CATHOLIC ELEMENTARY SCHOOL

NEW CATHOLIC ELEMENTARY SCHOOL C/W DAYCARE

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11887) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/binbrook_catholic_elementary_school
Last edited by CaGBC Import bot 7 months ago

Biology Building - Acadia University

This important addition to the Acadia Campus will contribute to the growing research and teaching activities underway at the University. It will help us attract and retain top-calibre students and world-class researchers from across the globe.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11125) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/biology_building_acadia_university
Last edited by CaGBC Import bot 7 months ago

Birks Building Renovation and Upgrade

The intent of this project is to restore this prominently located "Architectural Jewel" to its former distinctive position and function in Winnipeg's downtown core. The proposed energy upgrades includes extensive electrical and mechanical work as well as extensive upgrades and restoration to the existing building's envelope. The proposed work on the one hundred and four year old building will serve to extend the life of the building for another century.

As the priceless, historically relevent elements of the building's exteriors have been restored about a decade ago, the planned interior construction will ensure the extension and continuation of the building's life cycle.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10299) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/birks_building_renovation_and_upgrade
Last edited by CaGBC Import bot 7 months ago

Blair Towns

The new Blair Towns at the Blairs represent a "Smart Growth" approach to multi-family development. This 78-unit apartment community, comprising one 4-story building and two 3-story buildings, was built on a surface parking lot located on a portion of the Blair property, a mixed-use urban site in downtown Silver Spring, Maryland with existing apartment buildings, shops, and a variety of parking facilities. The Blair Towns apartments offer the added value of variety in unit types and high-end interiors.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=202) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/blair_towns
Last edited by US Department of Energy 7 months ago

Blusson Hall

description pending /buildings/blusson_hall
Last edited by karidow 6 months ago

Bohemian Embassy Suites

Twin-towers multi-unit Residential

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10432) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bohemian_embassy_suites
Last edited by CaGBC Import bot 7 months ago

Bond Center

Bond Street Properties Inc. is pleased to present its proposal for the development and

construction of two hi-rise residential structures to be located at the northeast corner of

Morrison Street and MacDonald Avenue.

The current geopolitical realities of the world have influenced and increased the level of oil

sands development in the Fort McMurray region, resulting in ever-increasing pressure on the

City's real estate market, as well as affording the City an unprecedented level of global

prominence.

Therefore, the rationale for the proposed development is supported by the following:

  1. The contemplated development will be the start of the creation of a downtown city

SKYLINE that will enhance the City's international image.

  1. The overall development, which includes retail and commercial space in conjunction with

the residential units, will provide an ANCHOR for the City's downtown core area.

  1. The upscale design of the development will assist in the REVITALIZATION of the downtown

business district.

  1. The development will assist in alleviating the City's current HOUSING shortage.

  2. Upon completion, the development will provide a substantial increase to the City's TAX

BASE.

In addition to the above-stated benefits to the City of Fort McMurray, the proposed

development has been carefully designed in order to ensure its quality, character, and

environmental compatibility. Following is a detailed description of the salient features of the

proposed development:

• 274 residential units

• 12,250 s.f. commercial space

• 438 parking stalls (exceeds requirement by 4 stalls)

• Amenity areas within the development include:

  • Transportation marshalling area for approximately 145 persons

  • Indoor garden atrium

  • Outdoor seating/barbeque area

  • On-site building manager

  • Social room

  • Library/reading room

  • Business Centre

  • Fitness Centre

  • Theatre Room

  • Billiard Room

  • Internet/Games Room

  • Guest Room

  • Car wash bay for residents

  • Large walkout patio areas at Podium and Podium + 2 levels

  • Balconies for all residential units

  • Solariums for all residential units

  • LEEDtm certified Building (silver, possibly gold). This world-recognized sustainable building

design certification represents a very positive image for the Fort McMurray oil-based

economy to project to the world.

The development has also been designed to conform to the Regional Municipality of Wood

Buffalo's Lower Townsite Redevelopment Plan.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10263) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bond_center
Last edited by CaGBC Import bot 7 months ago

Boreal Centre for Bird Conservation

The Lesser Slave Lake Boreal Centre for Bird Conservation is being built to serve these 3 major functions: research, education, and tourism.

The building has been designed to operate largely "off-grid”. There is no piped gas, no piped water or sewer. The centre features geotechnical heating/cooling, composting toilets, waterless urinals, rainwater collection and purification, and natural ventilation.

The new Centre is to house up to 20 staff and 60 visitors within its of usable area and was designed for flexibility, expandability in 2 directions, and uniqueness to the Slave Lake Region.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10262) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/boreal_centre_for_bird_conservation
Last edited by CaGBC Import bot 7 months ago

Bow Valley College

Major renovation of a 25,000 m2 college building in dense area of downtown Calgary. Ground level(currently parking) below upper levels to be enclosed and developed.

Reconfiguration of other levels

Existing mechanical and lighting to be replaced.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10374) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bow_valley_college
Last edited by CaGBC Import bot 7 months ago

Bow Valley College - Phase 2

The new BVC Phase 2 project is the first major construction project on Block 40 in downtown Calgary. The new building will be constructed where the former Provincial Courthouse and City of Calgary parkade are situated. The project will be connected to BVC Phase 1 (currently being renovated) across 6 Avenue SE via a new +15/+30 connection. Four levels of underground parking will be provided under the building. The parkade will be expanded when the balance of Block 40 is developed. The south face of the project will tie into a new LRT platform.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11574) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bow_valley_college_phase_2
Last edited by CaGBC Import bot 7 months ago

BPA Ampere Annex

The Bonneville Power Administration (BPA), a federal agency headquartered in Portland, Oregon, provides about half of the electricity used in the Pacific Northwest and operates more than three-fourths of the region's high-voltage transmission. Because BPA markets power at cost from 31 federal dams, its rates are among the least expensive electricity in the country.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=386) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/bpa_ampere_annex
Last edited by US Department of Energy 7 months ago

Brandon CancerCare Manitoba

The Brandon CancerCare facility will be located across from the Brandon Regional Health Centre in Brandon MB. This project will displace part of an existing parking lot, and will utilize a high proportion of recycled materials while minimizing landfilled waste. Extensive glazing and low-emitting materials will enhance the health and well-being of the patients and staff at this facility.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11367) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/brandon_cancercare_manitoba
Last edited by CaGBC Import bot 7 months ago

Brandon YMCA Centre

The Brandon YMCA project consists of a redevelopment and expansion of the YMCA's existing facilities. The new centre will boast a state-of-the-art pool area, additional capacity, and extensive fitness facilities among other improvements. The project will focus its efforts on water conservation, building reuse, and energy efficiency.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11365) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/brandon_ymca_centre
Last edited by CaGBC Import bot 7 months ago

Brantford Mall - Building E

First Capital's one of several LEED Core and Shell registered projects on this site.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11678) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/brantford_mall_building_e
Last edited by CaGBC Import bot 7 months ago

Brantford Mall - Building J

First Capital's one of several LEED Core and Shell registered projects on this site.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 11677) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/brantford_mall_building_j
Last edited by CaGBC Import bot 7 months ago

Bremerton BEQ Building 1044

The Bremerton Bachelor Enlisted Quarters (BEQ) Building 1044, was constructed as part of a navy base housing complex that will eventually contain seven BEQ buildings divided into several projects extending through 2015. The building provides 132 living units along with common areas and support spaces. The living units are occupied only when the sailors are on-shore.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=498) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/bremerton_beq_building_1044
Last edited by US Department of Energy 7 months ago

Brentwood Skytrain Station

Imported from VEDC, this article is a stub, you can help the Green Building Brain by expanding on it.

/buildings/brentwood_skytrain_station
Last edited by Vancouver Economic Development Commission 7 months ago

Brewery Block 4

Brewery Block 4 is one of five blocks redeveloped as part of an effort to revitalize the old Blitz-Weinhard Brewery District in downtown Portland. The Brewery Blocks successfully incorporate historically significant buildings—brewery relics such as two 4,500-gallon grain towers—and new construction to form an environment that is reminiscent of the area's industrial past yet promising of a sustainable, progressive future.

**This building was originally imported from the U.S. Department of Energy Energy Efficiency and Renewable Energy

Building Technologies Database (http://eere.buildinggreen.com/overview.cfm?projectid=224) on 2009-06-06. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.**
/buildings/brewery_block_4
Last edited by US Department of Energy 7 months ago

Bridgegate on Crowsnest Lake

The Etea Spa & Resort is a private residence club located on a 26 acre parcel of lakefront property in the scenic Crowsnest Pass. This site is situated 200 kilometres southwest of Calgary in the Canadian Rockies on a freshwater lake.

The first phase of the development will engage the area of land closest to the lake on the two-tiered site. The architecture consists of three curving masses that flow and compliment the natural rock outcroppings, shoreline and landscape. The spaces in-between the buildings have been carefully composed to afford framed views of Crowsnest Lake. Nonetheless the spaces within the buildings have been intimately linked together to provide unobstructed access and interconnection for year-round comfort. The buildings have also been sited to optimize their potential to harvest wind and solar energy. These natural forces have also played a part in forming the bold and smooth articulation of the contemporary architectural forms.

Programmatically, the Etea Spa & Resort will consist of approximately 600 living units that will be marketed as full and fractional ownership condominiums. The primary developed amenity of the resort will be a 40,000 square foot spa. Secondary amenities include 2 restaurants, a fitness and wellness area, indoor and outdoor pools, a theatre, sales, centre, and several unique lounge spaces. The development is situated upon an underground parkade that will also house the loading, garbage, and back of house requirements.

One of the primary objectives for this project is to compliment the site's natural beauty. With this mandate in mind we have tailored our design to have a minimal footprint on the site in order to reduce the impact we have on the existing neighboring ecosystems. This directive has also initiated us to take all possible measures to minimize environmental impact during the project's development and eventually through the day-to-day operations of the resort.

This building was originally imported from the Canadian Green Building Council's http://www.cagbc.org/leed/leed_projects/ id: 10709) on 2009-06-09. Please confirm that the import was successful, login, and remove this message. Help make the Green Building Brain better.

/buildings/bridgegate_on_crowsnest_lake
Last edited by CaGBC Import bot 7 months ago
« Previous 1 3 4 5 6 7 8